Overview : ITB of Supply, delivery & Installation of Laboratory Furniture – (National Drugs Quality Control Laboratory (NDQCL)) - ITB/KRT/GF/14/018. For more details on specifications, requirements & mode of submission, refer to below mentioned web-link to download the bidding document:- http://intra.sd.undp.org/bids/doc/1277.pdf Bid Bulletin no. (1) EXTENSION OF DEADLINE. •Bid Submission Deadline extended to 15th March 2015, 12:00 PM (Sudan local time) instead of 10th March 2015. •Bid opening will be on 15th March 2015, 2:00 PM (Sudan local time) at UNDP office - 290 Garden city - Khartoum - SUDAN. Bid Bulletin no. (2) AMENDMENT OF ITB DOCUMENT ~~The amendments are indicated in red fonts on following pages of amended ITB document. (http://intra.sd.undp.org/bids/doc/1280.pdf) : 1. Page 19 = Performance security will be 5% of the contract value 2. Page 20 = As per bulletin no. 1, the deadline has been amended to 15th March 2015 (12:01 PM) and the bid opening will be on the same day at 2:00 PM (Sudan Local time). 3. Page 23 = The material of the counter for microbiology lab has been specified 4. Page 24 = Laboratory Sinks and Drip Cup specifications have been amended. 5. Page 25 = Additional notes have been included. 6. Page 26 – 41 = Regarding the provided lab diagrams, substantial corrections are made to the dimensions of counters. 7. Page 53 = Installation cost of qualified personnel that has sufficient knowledge and skills to install the furniture at the lab. **Kindly refer to the amended ITB document for preparing the offer**. ~~(http://intra.sd.undp.org/bids/doc/1280.pdf) Bid Bulletin no. (3) Amendment No.(3) ~The purpose of this bid bulletin is to inform all interested bidders about the latest changes made to the ITB document. Please note that this amendment Bulletin no. 3, supersedes all previous amendments. ~1. Page 26 – 41 = Referring to the updated lab diagrams, substantial corrections are made to the dimensions of counters. 2. Page 27 = First floor, counter no. 3 (the number of the top cabinet increased to 5 instead of 3). Page 29 = Second floor, counter no. 1 (the number of the top cabinet to be 7 instead of 6). Page 35 = Third floor, counter 1 (the number of the top cabinet to be 9 instead of 6). 3. Page 49 – 52 = The counter dimensions have been updated in the Lab diagrams. ~~**Kindly refer to the amended ITB document for preparing the offer**. http://intra.sd.undp.org/bids/doc/1285.pdf |