ITB-053/16 – Rehabilitation of Big Ramadi Water Project 6000m3/hr. Anbaar-Iraq.

Link to Atlas Project

00089459 - Funding Facility for Stabilization

Documents

ITB-053/16 – Rehabilitation of Big Ramadi Water Project
ITB-053/16 - Word Format
Clarification Note No.1

Overview

        All the Bidders are kindly advised that Clarification Note no. 1 has been posted.

 

 ITB-053/16 – Rehabilitation of Big Ramadi Water Project 6000m3/hr. Anbaar-Iraq.          

The project target is to develop Big Ramadi Water Project which is located at the north of Ramadi beside Euphrates River to reach its high capacity and quality in providing many neighborhoods in Ramadi city with the purified water. The capacity of this water station is 6000 m3/hr.

The work includes cleaning the site, cleaning the withdrawal area (land and river), repairing the existing buildings, repairing the filters valves, some mechanical and electrical provisions and works, replacing the filters materials, clean the sedimentation basins, provision of specialized equipment such as 6 pumps of different capacities, repairing an existing generator of 2000 kVA capacity.