UNDP Samoa- Solar carport design to CAP-IT project (WSM_PROG_CAP-IT)- REQ0128672
Procurement Process
RFQ - Request for quotation
Office
UNDP-HQ - SAMOA
Deadline
05-Oct-23 @ 04:50 AM (New York time)
Published on
25-Sep-23 @ 12:00 AM (New York time)
Reference Number
UNDP-HQ-00508
Contact
Amanda Acosta Owens - amanda.acosta.owens@undp.org
If you already have a supplier profile, please access the negotiation using quicklink or please login to the Supplier Portal, then search for the negotiation using the reference number UNDP-HQ-00508, following the instructions in the user guide.
Introduction
[the below text is taken from the Terms of Reference document attached to this tender, kindly download this document and review the information there]
Project Objective:
Climate Acts ion Pathways for Island Transport (CAP-IT) project aims to promote the urgent and inclusive transformation of the land and maritime transport sectors toward decarbonization. This will be done by accelerating the uptake of electric vehicles (EVs) in support of the achievement of Samoa’s enhanced Nationally Determined Contributions for the energy and transport sector by 2030. As part of CAP-IT project, UNDP expects to acquire between 50-60 EVs and install private and public EV charging infrastructure with solar charging option.
This tender is seeking a suitable supplier that could undertake a detailed design of three solar carports based on the required dimensions, the number of solar PV panels to be installed, and Samoa building code requirements.
Scope of Services
The main purpose of solar carports is to provide power for electric vehicle charging. ITM requires high quality for the system as it will also serve as a showcase for the Pacific region. The following document provides the minimum requirements for the solar carport design. The Contractor shall be certified structural engineer by Institution of Professional Engineers Samoa (IPES) and demonstrate a good understanding of Development Consent and Building Permit application process in Samoa. The contractor will be responsible for the provision of detailed solar carport design and drainage system including drawings, calculation notes, and Bill of Quantity (BOQ). The delivery is to be approved by an UNDP appointed engineer and will be used to