Works on Energy Rehabilitation - Building in Mike Alasa 14 Belgrade

This specific tender is managed via the new supplier portal system of UNDP Quantum. If you are interested in submitting a bid for this tender, you must subscribe following the instructions in the user guide. If you have not registered a profile with this system, you can do so by following the link for Supplier Registration.

If you already have a supplier profile, please login to the Supplier Portal, then search for the negotiation using the reference number UNDP-SRB-00724,1, following the instructions in the user guide.

Introduction

Dear Bidders, 

The United Nations Development Programme (UNDP) Country Office in Serbia invites offers from qualified suppliers for the perform construction, crafts and services works on reconstruction and energy rehabilitation of the Government building in Mike Alasa 14 in Belgrade. Interested suppliers must submit their offer directly in the system following this link:   http://supplier.quantum.partneragencies.org using the profile you may have in the portal. In case you have never registered before, follow the https://estm.fa.em2.oraclecloud.com/fscmUI/faces/PrcPosRegisterSupplier?prcBuId=300000127715297&_adf.ctrl-state=azywmctp_1&_afrLoop=6329722925931702&_afrWindowMode=0&_afrWindowId=null&_afrFS=16&_afrMT=screen&_afrMFW=1042&_afrMFH=575&_afrMFDW=1280&_afrMFDH=720&_afrMFC=8&_afrMFCI=0&_afrMFM=0&_afrMFR=144&_afrMFG=0&_afrMFS=0&_afrMFO=0 to register a profile in the system. Do not create a new profile if you already have one. Use the forgotten password feature in case you do not remember the password or the username from previous registration. Follow the instructions in the guide to search the tender, subscribe, and submit bid response.

Please indicate whether you intend to submit a bid by creating a draft response without submitting directly in the system. This will enable the system to send notifications in case of amendments of the tender requirements. Should you require further clarifications, kindly communicate using the messaging functionality in the system. 

Important note: 
PRE-BID conference will be conducted on 23 December 2024, at 13.00 CET (Belgrade Time) while site inspection will be organized on the same day at 14:00 CET (Belgrade time)Attendance on the PRE-BID conference and site inspection are mandatory. A bidder which does not attend the PRE-BID conference and /or the site inspection shall become ineligible to submit a bid under this ITB. Bidders must pre-register for the meeting using instructions provided under the Bid Data Sheet document. 


We are looking forward to receiving your bid.          

          

UNDP CO Serbia 


Amendment

The Amendment 1 refers to the following changes that are made to the “Form H - Price Schedule - Bill of Quantity” document, Sheet "1 ARCH-ENERGY E", group of works "IV- INSULATION WORKS", items no: 12, 12.1, 12.2 and 12.3, in the column “Description of item”: Instead of: “12 Fabrication of horizontal thermal insulation on flat roofs from stone wool, with thicknesses as per the Design, type Knauf or equivalent. Technical specifications of the thermal insulation are: Thermal conductivity coefficient λD≥0.038 W/mK Fire reaction class A1 - non-combustible material Allowable thickness deviation class min T5 Declared compressive strength at 10% compression > 70 kPa Delamination >10 kPa Point load N> 650 All work must be done according to the Design, technology, and recommendations of the thermal insulation manufacturer.” shall be read as follows: “12. Fabrication of horizontal thermal insulation on flat roofs from stone wool, with thicknesses as per the Design, type Knauf or equivalent. Technical specifications of the thermal insulation are: Thermal conductivity coefficient λD≥0.038 W/mK Fire reaction class A1 - non-combustible material Allowable thickness deviation class min T5 Declared compressive strength at 10% compression > 70 kPa Delamination >10 kPa Point load N> 650 All work must be done according to the Design, technology, and recommendations of the thermal insulation manufacturer. Measured per m² of completed thermal insulation.” Instead of: “12.1 Design Designation K-1*. Measured per m² of complete thermal insulation.” shall be read as follows: “12.1 Stone wool thickness d=8 cm Design Designation K-5*.” Instead of: “12.2 Stone wool thickness d=8 cm. Design Designation K-5*.” shall be read as follows: “12.2 Stone wool thickness d=20 cm. Design Designations K-2*, K-3*, K-4* ” Instead of: “12.3 Stone wool thickness d=20 cm. Design Designations K-2*, K-3*, K-4*.” shall be read as follows: “12.3 Stone wool in a layer with a thickness of d=20-25 cm Design Designation K-1*.” The above amended provisions have been incorporated in the Negotiation requirement accordingly, i.e. “Form H - Price Schedule - Bill of Quantity Amended” document has been uploaded into the system and replaces the previous version.

Documents :

Negotiation Document(s) (Before Accessing other negotiations Document(s), please click on this link)
Sustainable Procurement Indicators :Environmental - Prevention of pollution / Requirement for a corporate environmental policy or an environmental management system (ISO 14001 or equivalent) / Minimum mandatory technical specifications and tender requirements