UNCC Security Enhancement - 2025
Office
UNDP-LBY - LIBYA
Deadline
25-Sep-25 @ 11:00 AM (New York time)
Published on
10-Sep-25 @ 12:00 AM (New York time)
Reference Number
UNDP-LBY-00516
Contact
Procurement Unit - procurement.ly@undp.org
If you already have a supplier profile, please access the negotiation using quicklink or please login to the Supplier Portal, then search for the negotiation using the reference number UNDP-LBY-00516, following the instructions in the user guide.
Introduction
Scope of Work (SoW) for Upgrading Security Measures for the UNCC, Janzour, Libya
1. Introduction
The project involves upgrading security measures for the United Nation Common Compound (UNCC), located in Tripoli, Libya. The contractor is required to deliver the needed tasks that meets the specified requirements and adheres to all applicable safety standards.
Coordinates of the compound: 32.83735657 N, 13.01315362 E
2. Scope of Work Overview
The scope of work includes, but is not limited to, the following activities:
a) Reinstallation of Existing Razor Wire (Inner Perimeter): Careful removal and reinstallation of existing razor wire along the inner perimeter using Y-shaped galvanized steel posts at 2.5-meter intervals to enhance internal security.
b) New Concertina Razor Wire Installation (60 cm): Supply and installation of new 60 cm galvanized concertina razor wire with Y-shaped steel posts welded to the structure for durability and tension resistance.
c) Lockable Metal Hinged Gates (2 Units): Installation of two lockable metal gates above existing steel gates, including I-beams, locking mechanisms, and triple-layer razor wire for added security and vehicle clearance.
d) Green Artificial Mesh Wire Installation: Supply and secure installation of green mesh wire matching existing material to improve privacy and reduce visibility from outside.
4. Project Schedule
- The project must be completed within the 45 days , with milestones set for the delivery of materials, installation, and final inspection.
- A detailed schedule will be provided upon project commencement, outlining specific deadlines for each stage of the project.
5. Quality Assurance
- All materials and components used must meet the specified quality standards and be approved by the client before installation.
- Workmanship must be of the highest quality, ensuring a professional finish and reliable operation of all systems.
6. Safety and Compliance
- All work must comply with local building codes and safety regulations.
- The contractor must implement all necessary safety measures to protect workers, client personnel, and property during the installation process.
7. Acceptance Criteria
- The project will be deemed complete when all works are installed, tested, and approved by the client.
- The contractor must address any deficiencies or issues identified during the final inspection to the client’s satisfaction.
- Final payment will be made upon successful project completion and client approval.