RFQ 47/2016 - Preparation of а Basic Design for Rehabilitation of the Spillway Dissipater and Stilling Pool of Mavrovica Dam

Link to Atlas Project

00092983 - EU Recovery Programme (Water Infrastructure)

Documents

RFQ 47/2016 - Preparation of a Basic Design for Rehabilitation of the Spillway Dissipater and Stilling Pool of Mavrovica Dam

Overview

REQUEST FOR QUOTATION

RFQ 47/2016 - PREPARATION OF A BASIC ENGINEERING DESIGN FOR REHABILITATION OF THE SPILLWAY DISSIPATER AND STILLING POOL OF MAVROVICA DAM 

ПОДГОТОВКА НА ОСНОВЕН ПРОЕКТ ЗА САНАЦИЈА НА ПРЕЛИВ И СЛАПИШТЕ НА БРАНАТА МАВРОВИЦА

1.      UNDP would hereby like to invite interested companies for design to submit offers in MKD, VAT exempted, in a sealed envelope not later than 07 September 2016 at 11.00 am at the address of UNDP.

2.      The RFQ including the ToR and BoQ (of the related works that have to be supervised)  for information purposes only, is available at the UNDP web site http://www.mk.undp.org (Operations/Procurement/Procurement Notices ref. ITB 47/2016)

3.       Late bids will be rejected.