Re-Advertise: Renewable Energy Project Analyst (for Filipino National only)
Procurement Process
IC - Individual contractor
Office
UNDP Country Office - PHILIPPINES
Deadline
17-Nov-19
Published on
04-Nov-19
Reference Number
60868
Overview
A. Project Title: Renewable Energy Project Analyst (DREAMS)
B. Project Description i. Goal: “reduce GHG emissions from the power sector, the objective is to promote and facilitate the commercialization of the renewable energy (RE) markets through the removal of barriers to increase investments in RE based power generation project.” ii. Outcome indicators: “Direct emissions reductions will be 205,181 tonnes of CO2eq hand. 20,000 sitio-based households will have access to RE sources. iii. Components and Expected outcomes: DREAMS has 4 components.
iv. Stakeholders for the project. The project is being implemented by the Department of Energy (DOE). DOE assumes over-all responsibility for the achievement of project results. The Project is co-financed with funding from the GEF. UNDP acts as the GEF Executing Agency. All components of the Project is being implemented by the Renewable Energy Management Bureau (REMB). A Project Support Group (PSG) composed of technical staff/specialist from the other Bureaus and divisions of DOE has been formed to provide technical advice in the implementation of the activities including monitoring and evaluation. A Project Steering Committee has been established to serve as a policy and decision-making body for the project implementation. A Project Management Unit (PMU) is based at the DOE Compound. The PMU is headed by a National Project Director (NPD) who is also the Director of the REMB. A Project Manager and support staff oversees the day to day operations of the DREAMS Project Management Office. The PMO is located at the office of the DOE in Taguig, Metro Manila.
| |||||||||||||||||||||||||||||||||||||||||||||
Description of Responsibilities : | |||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
C. Scope of Work The IC will contribute his/her technical expertise in the coordination and conduct of studies/researches , facilitation of technical fora, monitoring of priority/urgent projects, production of policy papers/documents and other activities that will contribute to the accomplishment of strategic plan of the Renewable Energy Management Bureau (REMB) and in support of the attainment of the stated outcomes of the DREAMS project in particular.
D. Expected Outputs and Deliverables The level of effort is 100 working days starting not later than (NLT) November 2019 - April 2020. The IC will provide direct technical and operational support to the Office of the National Project Director (NPD). The actual schedule of the deliverables of the Independent Contractor (IC) will be based on an approved work plan. It is anticipated that the IC will assist in the conduct of two to three (2- 3) research projects/technical policy studies during this period. The studies and the activities will be contained in an Inception Plan.
E. Institutional Arrangement The IC will report directly to the NPD for his/her assignments and instructions on the priority activities that need to be undertaken during the duration of this contract. He/She will be provided a dedicated working space at the DOE-REMB office. The IC is expected to have his/her own computer or word processing equipment equipped with Windows and other commonly used word processing software.
F. Duration of the Work The IC will work will be apportioned over a period 100 work-days upon signing of contract. The IC is expected to report at least 4 days a week at the REMB office except on holidays or as may be advised/approved by the NPD.
G. Duty Station The IC will be based in Manila. There will be occasional travels to attend forum, workshops or field visits of existing projects.
H. Scope of Price Proposal and Schedule of Payments This is a lump sum/all-inclusive approach. However, duty travels outside of Metro Manila that may be required (cost of transport, meals and accommodation) will be covered by the PMU.
| |||||||||||||||||||||||||||||||||||||||||||||
Competencies : | |||||||||||||||||||||||||||||||||||||||||||||
Corporate competencies
Functional and technical competencies
| |||||||||||||||||||||||||||||||||||||||||||||
Qualifications : | |||||||||||||||||||||||||||||||||||||||||||||
|