Overview : REQUEST FOR QUOTATION (RFQ) (Supply and Delivery of IT Equipment at Tonga ) (Advertisement) DATE: 24th October 2022 REFERENCE: RFQ/FJI/062/2022 Dear Sir / Madam: We kindly request you to submit your quotation for Supply of IT Equipment as detailed in Annex 1 of this RFQ. Quotations must be submitted via email to the following address: Email: etenderbox.pacific@undp.org Quotations submitted by email and must be free from any form of virus or corrupted contents, or the quotations shall be rejected. It shall remain your responsibility to ensure that your quotation will reach the address above on or before the deadline. Quotations that are received by UNDP after the deadline indicated above, for whatever reason, shall not be considered for evaluation. If you are submitting your quotation by email, kindly ensure that they are signed or stamped. Please take note of the following requirements and conditions pertaining to the supply of the abovementioned good/s Delivery Terms [INCOTERMS 2010] | ☒DAP Freight /clearance cost to be included if vendor is not based in Tonga | Customs clearance1, if needed, shall be done by: | ☒Supplier/Offeror | Exact Address/es of Delivery Location/s (identify all, if multiple) | National Emergency Management Office, Otto Snaft Building Level 3, Taufa’ahau Rd. Nuku’alofa. Tonga |
1 Must be linked to INCO Terms chosen. Latest Expected Delivery Date and Time (if delivery time exceeds this, quote may be rejected by UNDP) | ☒ 1 month from PO Issuance | Delivery Schedule | ☒Required (Indicate by when the items can be delivered) | Mode of Transport | Bidders may choose whichever is preferred | Preferred Currency of Quotation2 | ☒ US Dollars | Value Added Tax on Price Quotation3 | Pay VIP | Warranty | 3-6 Months minimum wherever applicable | Deadline for the Submission of Quotation | 08 November 2022 (New York Time) | All documentations, including catalogs, instructions and operating manuals, shall be in this language | ☒ English | Documents to be submitted4 (Mandatory) | ☒ Quotation in accordance with the list of requirements in Annex 1 ☒ Standard technical information of the product | Period of Validity of Quotes starting the Submission Date | ☒ 60 days | Partial Quotes | ☒ Not Permitted | Payment Terms5 | ☒ 100% upon complete delivery of goods |
2 Local vendors must comply with any applicable laws regarding doing business in other currencies. Conversion of currency into the UNDP preferred currency, if the offer is quoted differently from what is required, shall be based only on UN Operational Exchange Rate prevailing at the time of UNDP’s issuance of Purchase Order. 3 This must be reconciled with the INCO Terms required by the RFQ. Furthermore, VAT exemption status varies from one country to another. Pls. tick whatever is applicable to the UNDP CO/BU requiring the goods. 4 First 2 items in this list are mandatory for the supply of imported goods 5 UNDP preference is not to pay advanced amount upon signing of contract. If vendor strictly requires advanced payment, it will be limited only up to 20% of the total price quoted. For any higher percentage, or advanced payment of $30,000 or higher, UNDP shall require the vendor to submit a bank guarantee or bank checque payable to UNDP, in the same amount as the advanced payment made by UNDP to the vendor. Evaluation Criteria | ☒ Technical responsiveness/Full compliance to requirements and lowest price6 Comprehensiveness of after-sales services ☒ Full acceptance of the PO/Contract General Terms and Conditions [this is a mandatory criterion and cannot be deleted regardless of the nature of services required] ☒ Earliest Delivery / Shortest Lead Time7 | UNDP will award to: | ☒ Only one Supplier | Type of Contract to be Signed | ☒ Purchase Order | Conditions for Release of Payment | Upon receipt and verification of items by NEMO Emergency Operations team in Tonga. | Annexes to this RFQ8 | ☒ Technical Specifications of the Goods Required (Annex 1) ☒ Technical and Financial Form ☒ General Terms and Conditions / Special Conditions for Contract. Non-acceptance of the terms of the General Terms and Conditions (GTC) shall be grounds for disqualification from this procurement process. | Contact Person for Inquiries (Written inquiries only)9 | Sivendra Michael Disaster Risk Reduction and Resilience Advisor sivendra.michael@undp.org Elena Wakolo Procurement Associate elena.wakolo@undp.org Any delay in UNDP’s response shall be not used as a reason for extending the deadline for submission, unless UNDP determines that such an extension is necessary and communicates a new deadline to the Proposers. |
Goods offered shall be reviewed based on completeness and compliance of the quotation with the minimum specifications described above and any other annexes providing details of UNDP 6 UNDP reserves the right not to award the contract to the lowest priced offer, if the second lowest price among the responsive offer is found to be significantly more superior, and the price is higher than the lowest priced compliant offer by not more than 10%, and the budget can sufficiently cover the price difference. The term “more superior” as used in this provision shall refer to offers that have exceeded the pre-determined requirements established in the specifications. requirements. The quotation that complies with all of the specifications, requirements and offers the lowest price, as well as all other evaluation criteria indicated, shall be selected. Any offer that does not meet the requirements shall be rejected. Any discrepancy between the unit price and the total price (obtained by multiplying the unit price and quantity) shall be re-computed by UNDP. The unit price shall prevail and the total price shall be corrected. If the supplier does not accept the final price based on UNDP’s re-computation and correction of errors, its quotation will be rejected. After UNDP has identified the lowest price offer, UNDP reserves the right to award the contract based only on the prices of the goods in the event that the transportation cost (freight and insurance) is found to be higher than UNDP’s own estimated cost if sourced from its own freight forwarder and insurance provider. At any time during the validity of the quotation, no price variation due to escalation, inflation, fluctuation in exchange rates, or any other market factors shall be accepted by UNDP after it has received the quotation. At the time of award of Contract or Purchase Order, UNDP reserves the right to vary (increase or decrease) the quantity of services and/or goods, by up to a maximum twenty-five per cent (25%) of the total offer, without any change in the unit price or other terms and conditions. Any Purchase Order that will be issued as a result of this RFQ shall be subject to the General Terms and Conditions attached hereto. The mere act of submission of a quotation implies that the vendor accepts without question the General Terms and Conditions of UNDP herein attached as Annex 3. UNDP is not bound to accept any quotation, nor award a contract/Purchase Order, nor be responsible for any costs associated with a Supplier’s preparation and submission of a quotation, regardless of the outcome or the manner of conducting the selection process. Please be advised that UNDP’s vendor protest procedure is intended to afford an opportunity to appeal for persons or firms not awarded a purchase order or contract in a competitive procurement process. In the event that you believe you have not been fairly treated, you can find detailed information about vendor protest procedures in the following link: http://www.undp.org/content/undp/en/home/operations/procurement/protestandsanctions/ UNDP encourages every prospective Vendor to avoid and prevent conflicts of interest, by disclosing to UNDP if you, or any of your affiliates or personnel, were involved in the preparation of the requirements, design, specifications, cost estimates, and other information used in this RFQ. UNDP implements a zero tolerance on fraud and other proscribed practices and is committed to identifying and addressing all such acts and practices against UNDP, as well as third parties involved in UNDP activities. UNDP expects its suppliers to adhere to the UN Supplier Code of Conduct found in this link : http://www.un.org/depts/ptd/pdf/conduct_english.pdf Thank you and we look forward to receiving your quotation. Sincerely yours, Elena Wakolo Procurement Associate 1.Background Information The HTHH volcanic event on the 15th of January 2022 and the subsequent landing of COVID19 in Tonga as concurrent events tested the capability and capacity of response agencies. One of the lessons learnt is to revisit the emergency preparedness framework and its ability to respond to concurrent disasters. This meant amongst other activities the updating of current workflows and increasing technological capability in the EOC. During the peek phases of the HTHH Disaster and the COVID19 outbreak, demand on the EOC more than doubled exceeding the capability both in human and equipment within the EOC to properly match the response demand. This proposal focuses on equipment need for the EOC, specifically desktops and communications devices. Procurement of new desktops with fit for purpose hardware and software as per specifications in Annex 1 - Destination / delivery
Supplier shall ensure ordered quantity are supplied within stipulated time of 14 – 21 days from date of order placement to the National Emergency Management Office, Otto Snaft Building Level 3, Taufa’ahau Rd. Nuku’alofa. . Total Quantity | Item Description /Specification | | 2 | Desktop Computer | I/O (Rear) | | Operating System | 3x USB 3.2 Gen 2 Type A | | Windows 11 Professional | 2x USB 2.0 Type A | | CPU | 1x DP out (1.2) | | Intel® Core™ i7-12700F Processor | 1x HDMI out (2.0) | | Chipset | 1x RJ45 (2.5G) | | Intel® B660 | 3x Audio jacks | | Graphics | Accessories | | MSI GeForce RTX™ 3060 Graphics | 1x Quick guide | | System Memory | 1x Power cord | | 2 x DDR4 up to 3200MHz SO-DIMMs 16GB DDR4 | Volume | | Installed | 10.36 L / 21.89pt | | Storage | Weight (N.W./ G.W.) | | 2x M.2 SSD (1x PCIe/SATA Auto-switch) | 7.71 kg (17.00 lbs) / 9.73 kg (21.45 lbs) | | 2x 2.5" SSD / HDD 1TB SSD Installed | Dimension (WxDxH) | | Wireless LAN | 131.85 x 372.20 x 402.70mm (5.19 x 14.65 x | | Wi-Fi 6 | 15.85 inch) | | Bluetooth | Software | | Yes | Drivers & MSI Utilities | | LAN | Anti-Virus (60 days trial) | | Realtek RTL 8125B (2.5G) | Warranty: 36 months | | Sound | | | 7.1 Channel HD Audio with Nahimic audio enhancer | | | Cooling System | | | Fan Cooler | | | I/O (Front) | | | 1x USB 3.2 Gen1 Type C | | | 1x USB 3.2 Gen1 Type A | | | 1x USB 2.0 Type A | | | 1x Mic-in | | | 1x Headphone-out | | | 1x USB 3.2 Gen 2 Type C | | 4 | PC Monitor | Viewing Angle | | 31.5" | 178°(H) / 178°(V) | | Panel Resolution | Aspect Ratio | | 2560x1440 (WQHD) | 16:9 | | Refresh Rate | Curvature | | 165Hz | 1000R | | Response time | Contrast Ratio | | 1ms(MPRT) | 2500:1 | | Panel Type | Active Display Area (mm) | | VA | 697.344(H)x392.256(V) | | Brightness (nits) | Pixel Pitch (H x V) | | 250 | 0.2724(H)x0.2724(V) |
| Surface Treatment | Signal Frequency | Anti-glare | 90.9-251.1KHz(H) / 48-165Hz(V) | Display Colors | Adjustment (Tilt) | 16.7M | -5° ~ 20° | DCI-P3 / sRGB | Adjustment (Swivel) | 85% / 110% | -30° ~ 30° | Video ports | Adjustment (Pivot) | 1x Display Port (1.2a) | -5° ~ 5° | 2x HDMI (2.0b) | Adjustment (Height) | Audio ports | 0 - 90mm | 1 x Earphone out | Dimension (W x H x D) | Kensington Lock | 704.6 x 558.4 x 287.0 mm / 27.74 x 21.98 x | Yes | 11.29 inch | VESA Mounting | Carton Dimension (W X H X D) | 75 x 75 mm | 836 x 212 x 505 mm / 32.91 x 8.35 x 19.88 inch | Power Type External Adapter | Weight (NW / GW) | 19V 3.42A | 6.95kg / 9.55kg | Power Input | 15.32 lbs / 21.05 lbs | 100~240V, 50~60Hz | Frameless Design | DYNAMIC REFRESH RATE TECHNOLOGY | Yes | FreeSync Premium | Warranty: 36 months | DCR | | 100000000:1 | | 2 | Mount Brand | Material | | 75x75,100x100 | Aircraft-Grade Aluminum, Steel, Plastic | | Screen Sizes | Quick Release VESA Plate | | 17'-32' | Yes | | Load Capacity | Cable Management | | 3~8kg (per monitor) | Yes | | Tilt Range | Installation | | -90°~+15° | Clamp, Grommet | | Swivel Range | Suggested Desktop Thickness | | -90°~+90° | 20mm - 100mm | | Screen Rotation | Warranty: 36 months | | 360° | | 8 | Desktop Computer | Interfaces Rear ports | | Small form factor | 2 USB 3.2 Gen 1 ports, 2 USB 2.0 ports with | | Operating System | Smart Power On, 1 DisplayPort 1.4 port, 1 HDMI | | Windows 11 Pro | 1.4b port, 1 RJ45 Ethernet port, 1 Optional | | Processor | video port (HDMI 2.0b/DisplayPort 1.4/VGA), 1 | | 12th Gen Intel Core i5-12500 (18 MB cache, 6 cores, 12 | Serial port (optional) | | threads, 3.00 GHz to 4.60 GHz Turbo, 65 W) | Wireless | | Memory | No Wireless LAN Card (no WiFi enablement) | | 16 GB, 2 x 8 GB, DDR4 | Power Supply | | Storage | 180 W internal power supply unit (PSU), 85% | | 256 GB, M.2 2230, PCIe NVMe, SSD, Class 35 | Efficient, 80 Plus Bronze | | Graphics | Dimensions (H x W x D) | | Intel Integrated Graphics | 290 x 92 |
|