View Notice

Civil engineering and construction works for 6 X Kestrel e400nb (3.5 kW) small scale wind turbine tower foundations
Procurement Process :RFQ - Request for quotation
Office :South Africa - SOUTH AFRICA
Deadline :14-May-21
Posted on :07-May-21
Development Area :OTHER  OTHER
Reference Number :78305
Link to Atlas Project :
00090545 - South African Wind Energy Project Phase II
Documents :
ANNEX 2
ANNEX 3
TERMS OF REFERENCE
REQUEST FOR QUOTATION
Overview :

This ToR is for the:

Civil engineering and construction works for 6 X Kestrel e400nb (3.5 kW) small scale wind turbine tower foundations, container foundation and connecting cable trenches (wind turbine(6)/container, container/1st post) with piping for Upper Blinkwater: RMLM: Eastern Cape, Minigrid project as per the wind turbine supplier specifications.

The work shall include all labour, materials and equipment necessary to design, install and commission the Works, as well as the maintenance component. All work not expressly called for in this document, but necessary for the complete and proper construction and maintenance of the wind turbine tower foundations, container foundation and wind turbine/container connecting cable trenches with piping shall be performed and furnished by the Contractor at no additional cost.

This ToR includes maintenance services for the defects period which is twelve (12) months from the Practical completion date. The 6 small scale wind turbine tower foundations, container foundation and connecting cable trenches (wind turbine(6)/container, container/1st post) with piping shall be ready for installation of the 6 small scale wind turbines and connected with the minigrid by no later than 1.5 months from contract signing.  The Contractor will be required to include a detailed project schedule with their submission, to demonstrate how they intend to meet the milestones, hold-points and the COD deadline.